Surat માં 18 મહિનામાં બનવા વાળો બ્રિજ 68 મહિના બાદ પણ ન બન્યો અને મંત્રીએ કરી નાખ્યો ઉદ્ધાટન | GT

ADVERTISEMENT

The bridge that was supposed to be built in Surat in 18 months was not built even after 68 months and the minister inaugurated it.

social share
google news

The bridge that was supposed to be built in Surat in 18 months was not built even after 68 months and the minister inaugurated it.

The bridge that was supposed to be built in Surat in 18 months was not built even after 68 months and the minister inaugurated it.

ADVERTISEMENT

ADVERTISEMENT

    follow whatsapp

    ADVERTISEMENT